Image

How to Reduce Regulatory Delays by Formalizing Design Control Processes

April 11, 2017
Sponsored by Arena
The medical device industry stands at the crossroads between innovation and increased regulation. The lack of formal Design History Files (DHF) and Device Master Records (DMR) is one of the most important reasons for issuing non-conformance directives to medical device makers. Luckily, effective Product Lifecycle Management (PLM) solutions, such as Arena PLM, can help to facilitate proper management of quality documentation, and ease the pains of the regulatory approval process while accelerating time to market.

In this whitepaper, we outline how Arena PLM can help medical device companies achieve the following: 

  • Improve design collaboration among global supply chain teams
  • Formalize design and document controls procedures and product record management
  • Streamline compliance and audits

Sponsored Recommendations

Flexible Power and Energy Systems for the Evolving Factory

Aug. 29, 2024
Exploring industrial drives, power supplies, and energy solutions to reduce peak power usage and installation costs, & to promote overall system efficiency

Timber Recanting with SEW-EURODRIVE!

Aug. 29, 2024
SEW-EURODRIVE's VFDs and gearmotors enhance timber resawing by delivering precise, efficient cuts while reducing equipment stress. Upgrade your sawmill to improve safety, yield...

Advancing Automation with Linear Motors and Electric Cylinders

Aug. 28, 2024
With SEW‑EURODRIVE, you get first-class linear motors for applications that require direct translational movement.

Gear Up for the Toughest Jobs!

Aug. 28, 2024
Check out SEW-EURODRIVEs heavy-duty gear units, built to power through mining, cement, and steel challenges with ease!