Image

How to Reduce Regulatory Delays by Formalizing Design Control Processes

April 11, 2017
Sponsored by Arena
The medical device industry stands at the crossroads between innovation and increased regulation. The lack of formal Design History Files (DHF) and Device Master Records (DMR) is one of the most important reasons for issuing non-conformance directives to medical device makers. Luckily, effective Product Lifecycle Management (PLM) solutions, such as Arena PLM, can help to facilitate proper management of quality documentation, and ease the pains of the regulatory approval process while accelerating time to market.

In this whitepaper, we outline how Arena PLM can help medical device companies achieve the following: 

  • Improve design collaboration among global supply chain teams
  • Formalize design and document controls procedures and product record management
  • Streamline compliance and audits

Sponsored Recommendations

7 Reasons Why Air Bearings Outperform Mechanical Bearings

Feb. 7, 2025
Frictionless air bearings and air bearing stages have decisive advantages in precision motion and automation applications.

Hexapod Robot Applications in Automation and Automotive Assembly

Feb. 7, 2025
Hexapod 6-DOF Robots in Automation and Automotive Assembly | 6-Axis Precision Parallel Robot | Cobot for High Precision Applications

What is a Difference between a Gantry Positioning System and a Split-Bridge?

Feb. 7, 2025
The design of a Gantry Positioning System and Split-Bridge Positioning system are related. Learn how they differ and what to use best for your application.

Application Solutions with 6-Axis Hexapod Positioning Systems

Feb. 7, 2025
Explore applications, articles, and background information on 6-Axis Hexapod Positioning Systems and how they can help you improve your alignment system.