Machinedesign 9087 Arena Reduce Regulatory Delays 770x400

How to Reduce Regulatory Delays by Formalizing Design Control Processes

April 11, 2017
Sponsored by Arena
The medical device industry stands at the crossroads between innovation and increased regulation. The lack of formal Design History Files (DHF) and Device Master Records (DMR) is one of the most important reasons for issuing non-conformance directives to medical device makers. Luckily, effective Product Lifecycle Management (PLM) solutions, such as Arena PLM, can help to facilitate proper management of quality documentation, and ease the pains of the regulatory approval process while accelerating time to market.

In this whitepaper, we outline how Arena PLM can help medical device companies achieve the following: 

  • Improve design collaboration among global supply chain teams
  • Formalize design and document controls procedures and product record management
  • Streamline compliance and audits

Sponsored Recommendations

How BASF turns data into savings

May 7, 2024
BASF continuously monitors the health of 63 substation assets — with Schneider’s Service Bureau and EcoStruxure™ Asset Advisor. ►Learn More: https://www.schn...

Agile design thinking: A key to operation-level digital transformation acceleration

May 7, 2024
Digital transformation, aided by agile design thinking, can reduce obstacles to change. Learn about 3 steps that can guide success.

Can new digital medium voltage circuit breakers help facilities reduce their carbon footprint?

May 7, 2024
Find out how facility managers can easily monitor energy usage to create a sustainable, decarbonized environment using digital MV circuit breakers.

The Digital Thread: End-to-End Data-Driven Manufacturing

May 1, 2024
Creating a Digital Thread by harnessing end-to-end manufacturing data is providing unprecedented opportunities to create efficiencies in the world of manufacturing.